Manufacturing Plan & Bill of Materials

Click here for our spreadsheet of plans for materials and manufacturing.
Posted by Unknown at 1:43 PM No comments:
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest
Labels: materials, plan
Newer Posts Older Posts Home
Subscribe to: Posts (Atom)

The Team

  • Carlea Hazzard
  • Dan Suchyta
  • Selman Mujovic
  • Unknown

All FURY Posts

  • ▼  2012 (15)
    • ►  03/04 - 03/11 (2)
    • ▼  03/11 - 03/18 (1)
      • Manufacturing Plan & Bill of Materials
    • ►  03/18 - 03/25 (1)
    • ►  03/25 - 04/01 (1)
    • ►  04/01 - 04/08 (1)
    • ►  04/08 - 04/15 (4)
    • ►  04/15 - 04/22 (5)

Top Posts

  • Personal Reflection - Dan Suchyta
    As a whole ME250 has taught me a lot and I have thoroughly enjoyed the class.  Before I would have had absolutely no idea how to start machi...
  • Final Machine & Bill of Materials
    the evolution of our machine: February, March, April      Our final car doesn't look too different from our original concepts. The b...
  • Reflection - Carlea Hazzard
    So, our team Balls of Fury and our little car certainly gave us trouble in the end. We had a slow start with the design and deciding our str...
  • Selman's Reflection
    The overall lesson I learned from ME250 was that what you create in the ideal world of SolidWorks could not be replicated into the real worl...
  • Design Expo
         The competition at the design expo was pretty exciting! And we're pretty happy with how we did.     We tied our first match, a...

  • Team 17 Ctools site

Search the Fury Blog

Created for ME 250, winter 2012, section 5. We are Team 17 under GSI Connor Moelmann. Awesome Inc. theme. Powered by Blogger.